EPS Ireland Ltd.
Mallow Bus. & Tech. Park
Mallow
Co. Cork
Tel: 022 31200
Fax: 022 31250

Operations & Maintenance

Water TreatmentWaste Water Treatment Bison Range

Water Treatment
We have designed, installed and operated systems delivering between 10m3 per day to 4,500 m3 per day. The complexity of these processes range from the simple, consisting of extraction and pumping to the complex, consisting of screening, pumping, pH control, oxidation, coagulation, flocculation filtration, chlorination and final pumping.
The contracts vary in scope of service from regular scheduled visits to full time staffing providing 24 hour cover where appropriate. We are always ready to discuss the clients wishes in the light of our operational experience with a view to providing the level of service the client wishes while offering sufficient input to ensure and protect the supply and process.

Reference List

Location
Capacity m3/d
Client
Monaghan WAS
4,500
Local Authority
Hacketstown WSS
800
Local Authority
Annagh GWS
2,500
Group Water Scheme
Whitechurch A
50
Commercial
Whitechurch B
50
Commercial

Wastewater Treatment

EPS have direct experience in the operation and maintenance of treatment plants and units serving a population equivalent ranging from 5 to 180,000. These processes vary from one tank systems to processes involving multiple pumping stations, screening, grit and grease removal, primary aeration, primary settlement, conventional and extended aeration system, final settlement, UV disinfection, sludge thickening and dewatering, preceded by mesophilic anaerobic digestion and soon to be followed by thermal drying of the sludge product with subsequent sludge reuse.

Location
Capacity Pop Equiv.
Client
Dundalk WWTP
180,000
Local Authority
Drogheda WWTP
70,000

Local Authority
Limerick WWTP
110,000

Local Authority
Midleton WWTP
10,000
Local Authority
Ballivor WWTP
1,500
Local Authority
Fedamore WWTP
500
Local Authority
Kilfinnane WWTP
500
Local Authority
Belgooly
1000
Commercial
Whitechurch
250
Commercial
Kilumney
1250
Commercial

Bison Range

“The Bison Range” of treatment plants require ongoing maintenance. This will ensure that the unit operates efficiently and that the full design lifetime for all parts and components is achieved. With every newly installed system and existing systems, we offer a range of maintenance and service options.

Our main service contract on offer involves the following:

- One site visit annually for a full and detailed inspection and service.

- Repair/replace any equipment which is covered under our warranty conditions.

- Provision of a full and detailed service record to our customers.

We also offer a more comprehensive range of service agreements which cover long term servicing of each plant installed.

Due to our involvement in this industry and with over 35 years experience, we are also in a position to offer service contracts for all makes and model of treatment plant. On a continuous basis we stock a broad range of air pumps, effluent pumps, and ancillary spares, etc, which ensures that our prices for replacement parts on older systems are extremely competitive.

E.P.S. also offer a fast response time to breakdowns or emergency call out’s through our existing staff resource and our network of certified installation and service agents.

Contact bison@epsireland.com for a competitive maintenance quotation.

Bison Maintenance Agreement

__________________________________________

Click Here To Read Case Studies

Water TreatmentWaste Water Treatment Bison Range


All Content Copyright © EPS Ireland 2008